"One9: Nine-Story Prefab Apartment Tower was Installed in Just Five Days"

Inhabitat | July 25, 2014

Prefab technology is revolutionizing the way we build our homes, one stackable Lego-like module at a time. Australian construction company Hickory Group recently completed one such example with the One9, a nine-story apartment tower that was installed in just five days. Built from 36 prefab modules, the One9 project also includes numerous environmentally sustainable features such as a gray water recycling system and solar hot water panels.

...More

"How S.F.’s Mid-Mission district is tranSForming"

SF Gate | July 17, 2014

Over the past five years, 1,400 new housing units have opened on Mission Street between Fifth Street and South Van Ness Avenue, including 800 studio apartments that landlord Angelo Sangiacomo built between Seventh and Eighth streets.

And there are a lot more coming.

On Mission between Eighth Street and around 10th Street, contractors are pouring floors on three mid-rise residential towers, construction that will bring an additional 500 units to the corridor by the end of 2015.

At 1400 Mission St., Tenderloin Neighborhood Development Corp. is building 190 affordable family units. Across the street, at 1415 Mission St., Martin Building Co. is working on 126 apartments, while a block to the east at 1321 Mission St., Berkeley developer Patrick Kennedy is well under way on 160 micro-studios and “micro-suites,” half of which will provide housing for students from the California College of the Arts.

...More